A bulb manufacturer works for 25 days a month on a twoshift basis. Each shift is of 8 hours…

A bulb manufacturer works for 25 days a
month on a twoshift basis. Each shift is of 8 hours duration. The marketing demand
estimates the monthly demand for the bulbs to be 48,000. If the manufacturing
system is a continuousflow mass-manufacturing type with feeder shops linked to
the assembly shops through a material flow control system, then compute the
following for the manufacturer:

Don't use plagiarized sources. Get Your Custom Essay on
A bulb manufacturer works for 25 days a month on a twoshift basis. Each shift is of 8 hours…
For as low as $7/Page
Order Essay

(a) The TAKT time for all the shops in the
manufacturing system.

(b) If the successive workstations in the
manufacturing plant are uniformly placed at a distance of three metres, at what
speed should the material handling system move between the work-stations?