A job shop has five machines for processing. There are six jobs to be processed. However, current…

A job shop has five machines for
processing. There are six jobs to be processed. However, current capacity
constraints indicate that only five jobs can be processed out of the six. The
planner needs to know which jobs to assign to the machines. Identify an optimal
loading of the shop on the basis of Table 18.16, which contains data on the
processing time of each job against each machine.

Don't use plagiarized sources. Get Your Custom Essay on
A job shop has five machines for processing. There are six jobs to be processed. However, current…
For as low as $7/Page
Order Essay

Leave a Reply

Your email address will not be published. Required fields are marked *

*

*

*