Suppose that the cost of the modications to the secondary
loop in the previous problem is one hundred million dollars. If the revenue
from the nuclear power plant is increased by half a million dollars a day when
the plant is operating normally, and the average time between refuelings is
18 months, how long will it take the utility to recover its original 
investment in retrotting the power plant? Assume that the modications can be
done while the power plant is shut down for its normal refueling cycle (see
Chapter 11). Do you think that this last assumption is a realistic one?